Project: Bruce Power
Location: Ontario, Canada

HMA Consulting undertook a review of the physical security and operations procedures at the Bruce Nuclear Power Plant in Ontario, the largest nuclear power plant in North America.

The plant encompasses a heavy water plant and two generating stations, each of which has four nuclear reactors.

HMA prepared a report, which defined the physical security   requirements with particular reference to the power stations, which covered:

  • Perimeter intrusion system (fencing, lighting and intrusion detection)
  • CCTV surveillance and recording system
  • Security control room
  • Security Communications Radio Systems
  • Card access and alarm monitoring system
  • Security voice intercom system Personal duress alarm system

HMA provided subsequent design upgrades for the facility.